Auto Coupler Removal & Installation – Rail & Hard Standing

Tagged under: Auto Coupler Couplers

This project was driven by flexibility as much as support. The client needed a safer way to remove and install a train auto-coupler on rail, but the equipment also had to move off the track and onto hard standing when required. That meant one handling system had to work both beneath the train and away from the rails.

W. Christie designed a dedicated auto-coupler removal and installation unit built around a rail-running bogie with hydraulic cradles and left/right adjustment. The equipment supports the coupler during removal and fitting, then can be transferred onto deployable swivel wheels for movement on hard standing. It can also be lifted by overhead crane or forklift when required.

A hinged rear cradle allows the unit to fit under the train with the coupler in place, then swing into position before support is taken. Front and rear cradles provide vertical support, hydraulic cylinders allow skew and side adjustment, and lashing points secure the coupler during handling. The result is a purpose-built rail handling solution that gives maintenance teams more control through the full removal and refit process.

Features

  • Rail-mounted bogie base
  • Deployable swivel wheels for hard standing use
  • Front and rear hydraulic support cradles
  • Left/right skew and side adjustment
  • Hinged rear cradle for under-train access
  • Overhead and forklift lifting provision

Benefits

  • Supports safer auto-coupler removal and refit
  • One unit works on rail and off rail
  • Better control during positioning and alignment
  • Easier transfer between train, track and workshop areas
  • Reduces reliance on improvised handling methods
  • Creates a more repeatable maintenance process